Skip to content
HomeSolutionsStorageWEKA WEKApod Nitro (8-Node, ConnectX-8 800Gb/s)
VAST Data / WEKANew

WEKA WEKApod Nitro (8-Node, ConnectX-8 800Gb/s)

Keep thousands of GPUs saturated with sub-millisecond training data.

Full manufacturer warrantyAuthorized channel48-hour quote

We help you choose, configure, and deliver the right system — no obligation.

WEKA WEKApod Nitro (8-Node, ConnectX-8 800Gb/s) — VAST Data / WEKA enterprise hardware
WEKA WEKApod Nitro (8-Node, ConnectX-8 800Gb/s) hardware detail 1
WEKA WEKApod Nitro (8-Node, ConnectX-8 800Gb/s) hardware detail 2
WEKA WEKApod Nitro (8-Node, ConnectX-8 800Gb/s) hardware detail 3

Configuration at a Glance

Form Factor8x 1U nodes (8U total)
Storage20x TLC NVMe SSDs per node, 0.5 PB usable starting point
Networking/FabricNVIDIA ConnectX-8 SuperNIC, 800 Gb/s per node (NDR InfiniBand or 400/800GbE)
Read ThroughputOver 720 GB/s per cluster

Tailored per engagement. Full technical overview below.

Configuration Options

Core specifications for this system. Every component is configurable to your workload — request a quote for a tailored build.

Storage

20x TLC NVMe SSDs per node, 0.5 PB usable starting point

Overview

The WEKApod Nitro is an eight-node all-NVMe appliance running the WEKA Data Platform, purpose-built to feed DGX SuperPOD-scale GPU fabrics over GPUDirect Storage. Nexus Compute specifies, configures, and tests each cluster to your throughput and capacity targets, delivered with full warranty through authorized WEKA channels.

Who This Solution Is For

AI labs training frontier and large-language models
Operators of DGX SuperPOD-scale GPU clusters
Teams whose GPUs stall waiting on storage I/O
Neocloud and GPU-as-a-service providers

Business Benefits

GPUs stay busy

Over 720 GB/s read throughput keeps every accelerator fed, turning idle GPU-hours into completed training runs.

Scales without rip-and-replace

Capacity and bandwidth grow linearly by adding nodes, so the fabric expands with your model roadmap.

Validated for SuperPOD

DGX SuperPOD and NCP certification removes integration risk from your AI factory build.

Typical Business Use Cases

1

Large-language-model and foundation-model training

2

GPUDirect Storage data feeding for DGX SuperPOD

3

High-throughput checkpoint read/write at scale

4

Multi-tenant GPU-cloud shared storage

Industry Applications

AI & Machine LearningHPCHigher Education & ResearchSaaS & SoftwareTelecom

Technical Overview

Each 1U node pairs 20 TLC NVMe SSDs with an NVIDIA ConnectX-8 SuperNIC delivering 800 Gb/s of network throughput, with the WEKA Data Platform presenting a single parallel namespace across all eight nodes. NVIDIA Magnum IO GPUDirect Storage moves data directly from NVMe to GPU memory, sustaining over 720 GB/s read and 186 GB/s write with more than 18 million IOPS per cluster.

Form Factor8x 1U nodes (8U total)
Storage20x TLC NVMe SSDs per node, 0.5 PB usable starting point
Networking/FabricNVIDIA ConnectX-8 SuperNIC, 800 Gb/s per node (NDR InfiniBand or 400/800GbE)
Read ThroughputOver 720 GB/s per cluster
Write ThroughputUp to 186 GB/s per cluster
IOPS18M+ per cluster
Data AccessNVMe-oF, RDMA, NVIDIA Magnum IO GPUDirect Storage
ManagementWEKA Data Platform, single global namespace
Certification & WarrantyNVIDIA DGX SuperPOD & NCP certified; manufacturer warranty via authorized channels

Specifications are indicative and configured to each engagement. Request a quote for a configuration tailored to your requirements.

Warranty, Support & Fulfillment

Every system ships from an authorized channel, configured and tested, with the documentation enterprise buyers need — backed by warranty and a dedicated account team.

Enterprise Warranty

Full manufacturer warranty with optional on-site, next-business-day support and extended coverage.

Authorized Channel

Sourced through Tier-1 distribution and OEM partners — never grey market. Asset & warranty records included.

Lead Time & Deployment

48-hour quotes, then configured, burn-in tested, and delivered on a committed schedule.

Nationwide Fulfillment

Coordinated logistics, rack-and-stack, and delivery wherever your infrastructure lives.

Frequently Asked Questions

How many GPUs can one WEKApod Nitro cluster feed?

An eight-node cluster sustains over 720 GB/s, enough to keep a multi-rack DGX SuperPOD of hundreds of GPUs fully fed; we size node count to your exact GPU count and model footprint.

Does it require InfiniBand?

No. The ConnectX-8 SuperNIC supports both NDR InfiniBand and 400/800GbE, so we match the fabric to your existing GPU network during configuration.

Can we start smaller and grow?

Yes. WEKA scales linearly by adding nodes, so capacity and bandwidth expand together without forklift upgrades or namespace disruption.

Hardware Assistance

Configure the WEKA WEKApod Nitro (8-Node, ConnectX-8 800Gb/s) with Nexus Compute

Tell us your requirements and a hardware specialist will help you specify, configure, and quote the right system — typically within two business days. No obligation.