PowerEdge XE9680 (8x NVIDIA HGX H200 141GB SXM5)
Maximum HBM3e capacity for long-context LLM training and inference
We help you choose, configure, and deliver the right system — no obligation.




Configuration at a Glance
Tailored per engagement. Full technical overview below.
Configuration Options
Core specifications for this system. Every component is configurable to your workload — request a quote for a tailored build.
8x NVIDIA HGX H200 141GB 700W SXM5
2x 5th Gen Intel Xeon Scalable, up to 64 cores each
32x DDR5 DIMM, up to 4TB at 5600 MT/s
Up to 16x E3.S NVMe Gen5
Overview
This PowerEdge XE9680 configuration pairs eight NVLink-connected NVIDIA HGX H200 SXM5 accelerators, each with 141GB of HBM3e, to serve memory-bound large language model training and high-batch inference. Nexus Compute specifies, integrates, and validates each system before delivery, backed by Dell ProSupport through authorized channels.
Who This Solution Is For
Business Benefits
More model per GPU
141GB of HBM3e per accelerator holds larger models and longer context windows on a single node, cutting cross-node communication overhead.
Higher inference density
Expanded memory and 4.8TB/s bandwidth raise concurrent batch sizes, lowering cost per served token.
Tested and warranty-backed
Each unit arrives thermally validated with baselined firmware and Dell ProSupport coverage arranged through authorized distribution.
Typical Business Use Cases
Long-context LLM training
High-throughput generative inference
Retrieval-augmented generation at scale
Mixture-of-experts model serving
Industry Applications
Technical Overview
The XE9680 hosts the NVIDIA HGX H200 8-GPU baseboard with full NVLink and NVSwitch interconnect, delivering up to 1.1TB of aggregate coherent GPU memory at 4.8TB/s per accelerator. Dual 5th Gen Intel Xeon Scalable CPUs, DDR5, and PCIe Gen5 feed the GPUs, with ConnectX-7 NDR InfiniBand for scale-out and iDRAC9 for management.
| GPU/Accelerator | 8x NVIDIA HGX H200 141GB 700W SXM5 |
| GPU Interconnect | NVLink + NVSwitch, 900GB/s GPU-to-GPU |
| CPU | 2x 5th Gen Intel Xeon Scalable, up to 64 cores each |
| Memory | 32x DDR5 DIMM, up to 4TB at 5600 MT/s |
| Storage | Up to 16x E3.S NVMe Gen5 |
| Networking/Fabric | NVIDIA ConnectX-7 400Gb NDR InfiniBand |
| Form Factor | 6U rack, air-cooled |
| Power | 6x 2800W PSU, 3+3 fault-tolerant redundant |
| Warranty | 3-year Dell ProSupport, upgradeable |
Specifications are indicative and configured to each engagement. Request a quote for a configuration tailored to your requirements.
Warranty, Support & Fulfillment
Every system ships from an authorized channel, configured and tested, with the documentation enterprise buyers need — backed by warranty and a dedicated account team.
Enterprise Warranty
Full manufacturer warranty with optional on-site, next-business-day support and extended coverage.
Authorized Channel
Sourced through Tier-1 distribution and OEM partners — never grey market. Asset & warranty records included.
Lead Time & Deployment
48-hour quotes, then configured, burn-in tested, and delivered on a committed schedule.
Nationwide Fulfillment
Coordinated logistics, rack-and-stack, and delivery wherever your infrastructure lives.
Frequently Asked Questions
When should I choose H200 over H100?
Pick the H200 when your workload is memory-bound, such as long-context inference, large RAG pipelines, or models that otherwise spill across nodes, since its 141GB HBM3e keeps more of the model resident per GPU.
Can this node serve and train on the same hardware?
Yes, the eight-way NVLink topology supports both distributed fine-tuning and high-batch inference, making it well suited to mixed train-and-serve platforms.
How is the system delivered for production use?
We integrate, burn-in test, and firmware-baseline each unit, then coordinate rack readiness and Dell ProSupport so it deploys without surprises.
Hardware Assistance
Configure the PowerEdge XE9680 (8x NVIDIA HGX H200 141GB SXM5) with Nexus Compute
Tell us your requirements and a hardware specialist will help you specify, configure, and quote the right system — typically within two business days. No obligation.